TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 63 of 772
TM 9-2350-260-20-1-2 2A ENGINE AND 2D ENGINE POWERPLANT TESTS (GROUND HOP) (Sheet 2 of 16) TOOLS: 3/8 in. socket head screw key (allen wrench) 1/2 in. combination box and open end wrench 3/4 in. combination box and open end wrench 3/4 in. socket with 1/2 in. drive Flat-tip screwdriver with 1/4 in. blade Ratchet with 1/2 in. drive Torque wrench with 1/2 in. drive (0-175 lb-ft) (0-237 N•m) 1-1/4 in. socket with 1/2 in. drive Spanner wrench Industrial goggles SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section I) FABRICATED TOOLS: Throttle linkage adjusting go/no-go gage (Fig. 3, Appendix F) Engine air cleaner (2 required) (Fig. 4, Appendix F) Tachometer (Fig. 2, Appendix F) PERSONNEL: Three REFERENCE: TM 9-2350-260-20-1-2 LO 9-23504260-12 PRELIMINARY PROCEDURE: Remove powerplant (page 5-1) NOTE Tests can be performed in any order. If more than one test is to be performed, do not disconnect test hookup. Disconnect test hookup only when test or tests are complete. Go on to Sheet 3 5-53