TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 62 of 772
TM 9-2350-260-20-1-2 2A ENGINE AND 2D ENGINE POWERPLANT TESTS (GROUND HOP) (Sheet 1 of 16) NOTE If you have and choose to use STE/ICE, there are two tests that you can perform: Test No. 13 (page 4-64) and Test No. 14 (page 4-69). PROCEDURE INDEX PROCEDURE PAGE Test Hookup 5-54 Idle Test 5-57 Governed No-Load Test 5-58 Stall Test 5-60 Engine Fuel Leak Test 5-65 After-Test Disconnect 5-67 WARNING Assign one crewmember with a fire extinguisher as fire guard during all powerplant tests. WARNING Take all necessary safety precautions to prevent possible injury to personnel or damage to equipment. Stand clear of both transmission output flanges whenever engine is running. Hearing protection is required. Go on to Sheet 2 TA147953 5-52