TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 593 of 772

TM 9-2350-260-20-1-2 MANIFOLD HEATER OPERATIONAL CHECK (Sheet 1 of 2) SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section I) PERSONNEL: Two PRELIMINARY PROCEDURE: Remove powerplant (page 5-1) OPERATIONAL CHECK: NOTE This procedure applies to manifold heaters on both 2A and 2D powerplants. Make this check after any part of manifold heater system is replaced. It requires two persons to complete. 1. Prepare engine for powerplant test run (page 5-4). 2. Station one person on side of engine that maintenance was performed, with one hand on intake manifold heater tube (A). Go on to Sheet 2 TA148399 7-324