TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 484 of 772
TM 9-2350-260-20-1-2 INTER-TANK SWING CHECK VALVE REPLACEMENT (Sheet 1 of 5) PROCEDURE INDEX PROCEDURE PAGE Removal 7-215 Inspection 7-217 Installation 7-217 TOOLS: Automotive wrench 7/8 in. combination box and 1-1/8 in. open end wrench open end wrench 9/16 in. socket with 1/2 in. drive 9/16 in. combination box and Ratchet with 1/2 in. drive open end wrench 1-1/4 in. open end wrench 1 in. combination box and Vise open end wrench 7/16 in. socket with 1/2 in. drive SUPPLIES: Lockwasher (MS35338-46) (2 required) (2D powerplant only) Lockwasher (MS35338-44) REFERENCE: TM 9-2350-260-10 PRELIMINARY PROCEDURES: Remove powerplant (page 5-1) Drain fuel tanks (page 7-153) REMOVAL: 1. Using 7/8 inch wrench to hold connector (A), use 1-1/8 inch wrench on connector (B) and remove hose (C) from elbow (D). 2. Using automotive wrench, remove elbow (D) from right fuel tank (E). Go on to Sheet 2 TA148290 7-215