TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 47 of 772
TM 9-2350-260-20-1-2 POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 12 of 26) CAUTION Check all disconnected rod and line ends, hoses, and cables to make sure they will be out of the way during powerplant removal. 33. Connect hoist hook to sling. Make sure hoist hook is put through hole used to lift powerplant. 34. Using hoist with sling, position sling over powerplant so T-end is to front of tank. 35. Attach four cable hooks of sling to four lifting eyes on powerplant. Make sure hook ends are toward outside of tank 36. Position personnel to guide powerplant as it is hoisted out of tank. Go on to Sheet 13 TA147938 5-37