TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 469 of 772

TM 9-2350-260-20-1-2 FUEL SHUTOFF VALVE, LEVER, LINK, AND BRACKET REPLACEMENT (Sheet 9 of 9) 22. Install link (Z) to lever (G) and rod end (AA). 23. Install two flat washers (AB), one onto each end of link (Z). 24. Using pliers, install two new cotter pins (AC), one into each end of link (Z). 25. Install 2A powerplant (page 5-14) or 2D powerplant (page 540). End of Task TA148275 7-200