TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 461 of 772
TM 9-2350-260-20-1-2 FUEL SHUTOFF VALVE, LEVER, LINK, AND BRACKET REPLACEMENT (Sheet 1 of 9) PROCEDURE INDEX PROCEDURE PAGE Removal 7-193 Cleaning and Inspection 7-196 Installation 7-196 TOOLS: Ratchet with 1/2 in. drive 5 in. extension with 1/2 in. drive 1/2 in. socket with 1/2 in. drive 7/16 in. combination box and open end wrench 10 in. adjustable wrench 7/16 in. socket with 1/2 in. drive Long round nose pliers Ball peen hammer 1/8 in. drive pin punch Wire brush Vise 1 in. open end wrench 1-1/8 in. open end wrench SUPPLIES: Sealing compound (Item 24, Appendix D) Cotter pins (MS24665-132) (2 required) Lockwasher (MS35338-46) (2 required) Preformed packings (MS28778-10) (2 required) Plastic cap Lockwashers (MS35338-44) (2 required) Spring pin (589784) REFERENCE: TM 9-2350-260-10 PRELIMINARY PROCEDURES: Remove powerplant (page 5-1) Pull fuel shutoff valve handle half way out (TM 9-2350-260-10) Go on to Sheet 2 TA148267 7-192