TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 46 of 772

TM 9-2350-260-20-1-2 POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 11 of 26) 30. Manually pull one lockring (AN) on each side of powerplant to unlock powerplant guide (AP). Swing guides (AP) rearward from powerplant -until they lock. 31. Make sure powerplant guide locks (AQ) engage when guides (AP) are all the way back. 32. Using 1-1/2 inch socket, remove two capscrews AR), two lockwashers (AS), and two flat washer assemblies (AT) holding two mounting brackets (AU) to transmission mounts (AV). Throw lockwasher away. Go on to Sheet 12 TA147937 5-36