TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 393 of 772

TM 9-2350-260-20-1-2 AIR CLEANER (ALUMINUM AND SIDE LOADING) BLOWER FAN GROUND LEAD REPLACEMENT(Sheet 2 of 2) INSTALLATION: 1. Connect two connectors (A) to blower leads (B). 2. Install new lockwashers (C) and screws D) to secure ground lead (E) terminal to boss (F). 3. Using wrench, tighten screw (D). 4. Check operation of blowers (TM 9-2350-260-10). 5. Install air cleaner cover and gasket (page 7-133, steps 3, 4, 8, and 9). End of Task TA148199 7-124