TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 392 of 772

TM 9-2350-260-20-1-2 AIR CLEANER (ALUMINUM AND SIDE LOADING) BLOWER FAN GROUND LEAD REPLACEMENT (Sheet 1 of 2) TOOLS: 7/16 in. combination box and open end wrench SUPPLIES: Lockwasher (MS35338-33) (2 required) REFERENCE: TM 9-2350-260-10 PRELIMINARY PROCEDURES: Remove air cleaner cover and gasket (page 7-131, steps 1 thru 3) Make sure MASTER CONTROL switch is OFF (TM 9-2350-260-10) NOTE Aluminum air cleaner shown. Procedure for side loading air cleaner is similar. REMOVAL: 1. Disconnect two connectors (A) from blower leads (B). 2. Using wrench, remove screw (C) and lockwashers (D) securing ground lead (E) terminal to boss (F). Throw lockwashers away. 3. Remove ground lead (E). Go on to Sheet 2 TA148198 7-123