TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 36 of 772

TM 9-2350-260-20-1-2 POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 1 of 26) PROCEDURE INDEX PROCEDURE PAGE Removal 5-3 Installation 5-14 TOOLS: 5/16 in. combination box and open end wrench 5 ton hoist or comparable lifting device capable of lifting powerplant 12 ft. high Ratchet with 1/2 in. drive 2 in. extension with 1/2 in. drive 9/16 in. socket with 1/2 in. drive Ratchet with 3/4 in. drive 1-1/2 in. socket with 3/4 in. drive Torque wrench with 3/4 in. drive (0-600 lb-ft) (0-813 Nm) 7/16 in. combination box and open end wrench (2 required) Adjustable wrench Spanner wrench Long round nose pliers Flat-tip screwdriver Putty knife Pinch bar SPECIAL TOOLS: Powerplant sling (Item 31, Chapter 3, Section I) FABRICATED TOOLS: Final drive guide shield (Fig. 1, Appendix F) (2 required) SUPPLIES: Covers for fire extinguisher tubing fittings Covers for prima fuel line fittings Covers for hydraulic brake line fittings Covers for fuel return line fittings Covers for air cleaner outlet hose connect point Grease (Item 36, Appendix D) Heavy masking tape (Item 57, Appendix D) Wooden blocks, 12 x 12 x 14 in. (3 required) Lockwasher (MS35338-44) (4 required) Lockwasher (MS35338-53) (2 required) Lockwasher (MS35338-65) (12 required) Gasket (2 required) Rag (Item 65, Appendix D) Lockwire (Item 60, Appendix D) Adhesive (Item 2, Appendix D) PERSONNEL: Three REFERENCE: TM 9-2350-260-10 Go on to Sheet 2 TA147927 5-26