TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 301 of 772
TM 9-2350-260-20-1-2 TUBE ASSEMBLY (FUEL INJECTION PUMP INLET TO BULKHEAD ELBOW) REPLACEMENT (Sheet 1 of 5) PROCEDURE INDEX PROCEDURE PAGE Removal 7-33 Cleaning and Inspection 7-34 Installation 7-34 TOOLS: 1 in. combination box and open end wrench 7/8 in. combination box and open end wrench 3/4 in. combination box and open end wrench 3/8 in. combination box and open end wrench Wire brush Flat-tip screwdriver SPECIAL TOOLS: Ground hop kit (Item 32, Chapter 3, Section I) SUPPLIES: Rags (Item 65, Appendix D) Drain pan Sealing compound (Item 27, Appendix D) Dry cleaning solvent (Item 54, Appendix D) Lockwasher (MS35335-40) Self-locking nut (MS21044-N3) (3 required) PRELIMINARY PROCEDURES: Remove powerplant (page 5-1) Remove cooling fans (page 9-48) Go on Sheet 2 TA148107 7-32