TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 265 of 772
TM 9-2350-260-20-1-2 ENGINE TO TRANSMISSION OIL LINE TUBE ASSEMBLIES (LEFT INNER AND OUTER) REPLACEMENT (2D ENGINE) (Sheet 2 of 4) NOTE Place rags (Item 65, Appendix D) under fittings (J), (A), (K), and (C). Upon removing tubes and fittings, seal powerplant openings with plastic barrier material (Item 41, Appendix D) and masking tape (Item 57, Appendix D) to prevent unnecessary exposure to moisture and contamination. Remove plastic barrier material and masking tape when installing tubes and fittings. REMOVAL: 1. Using 1-5/8 inch wrench to hold adapter (A), use 1-1/2 inch wrench and loosen connector (B). 2. Using 1-5/8 inch wrench to hold adapter (C), use 1-1/2 inch wrench and loosen connector (D). 3. Using hands, disconnect and remove tube (E) from powerplant. 4. Using 1-5/8 inch wrench, remove adapters (A) and (C) and gaskets (F) and (G). Throw gaskets away. 5. Using 1-5/8 inch wrench to hold adapter (H), use 1-1/2 inch wrench and loosen connector (J). 6. Using 1-5/8 inch wrench to hold adapter (K), use 1-1/2 inch wrench and loosen connector (L). 7. Using hands, disconnect and remove tube (M) from powerplant. 8. Using 1-5/8 inch wrench, remove adapters (H) and (K) and gaskets (N) and (P). Throw gaskets away. Go on to Sheet 3 TA147634 6-188