TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 263 of 772

TM 9-2350-260-20-1-2 ENGINE TO TRANSMISSION OIL LINE TUBE ASSEMBLIES (RIGHT INNER AND OUTER) REPLACEMENT (2D ENGINE) (Sheet 4 of 4) 11. Remove rags placed under transmission connectors (J) and (R) and oil cooler connectors (H) and (Q). 12. Replenish oil lost during oil line tube assemblies removal (LO 9-2350-260-12). 13. Connect powerplant for powerplant ground hop (page 5-54). 14. Start and run engine. Check for oil leaks at oil cooler and transmission oil line tube assembly connections. 15. Shut down engine. Disconnect powerplant from ground hop kit (page 5-67). 16. Install engine shroud (page 9-3). 17. Install rear engine shroud support (page 9-5). 18. Install powerplant (page 5-40). End of Task TA147632 6-186