TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 248 of 772

TM 9-2350-260-20-1-2 THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE) TEST AND REPLACEMENT (2D ENGINE) (Sheet 7 of 7) 14. Replenish oil lost during valve assembly replacement (LO 9-235-260-12). 15. Remove rags from transmission and oil cooler. 16. Start and run engine (TM 9-2350-260-10). Check for oil leaks. 17. Install engine shroud (page 9-3). 18. Install transmission shroud (page 9-23). End of Task 6-171