TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 230 of 772

TM 9-2350-260-20-1-2 TRANSMISSION OIL COOLER REPLACEMENT (2D ENGINE) (Sheet 10 of 10) 24. Replenish oil lost during oil cooler replacement (LO 9-2350-260-12). 25. Connect engine for powerplant ground hop (page 5-54). 26. Start and run engine. Check for oil leaks at oil cooler and line connections. 27. Shut down engine. Disconnect engine from powerplant ground hop kit (page 5-67). 28. Install engine shroud (page 9-3). 29. Install powerplant (page 540). End of Task 6-153