TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 220 of 772
TM 9-2350-260-20-1-2 TRANSMISSION OIL COOLER REPLACEMENT (2A ENGINE) (Sheet 10 of 10) 22. Position elbow (X) onto turbocharger (Y). 23. Using 1/2 inch wrench, install eight nuts and washers (Z) securing elbow (X) to turbocharger (Y). 24. Replenish oil lost during transmission oil cooler replacement (LO 9-235-260-12). 25. Ground hop powerplant (page 5-54). 26. Start and run engine. Check for oil leaks at transmission oil cooler and line connectors. 27. Disconnect ground hop kit (page 5-67). 28. Install engine shroud (page 9-3). 29. Install powerplant (page 5-14). End of Task TA147594 6-143