TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 211 of 772

TM 9-2350-260-20-1-2 TRANSMISSION OIL COOLER REPLACEMENT (2A ENGINE) (Sheet 1 of 10) PROCEDURE INDEX PROCEDURE PAGE Removal 6-135 Installation 6-140 TOOLS: 1/2 in. combination box and open end wrench 1-1/2 in. combination box and open end wrench Diagonal cutting pliers Flat-tip screwdriver 1/2 in. socket with 1/2 in. drive 9/16 in. socket with 1/2 in. drive Ratchet with 1/2 in. drive 1-3/4 in. open end wrench 9/16 in. combination box and open end wrench 1-5/8 in. combination box and open end wrench Slip joint pliers SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section I) SUPPLIES: Masking tape (Item 57, Appendix D) Plastic barrier material (Item 41, Appendix D) Transmission oil cooler bypass valve gasket (NAS1598-6V) Lockwire (Item 60, Appendix D) Shroud-to-oil-cooler lockwasher ( ) (2 required) REFERENCES: TM 9-2350-260-10 LO 9-2350-260-12 PRELIMINARY PROCEDURES: Remove powerplant (page 5-2) Remove engine shroud (page 9-2) Go on to Sheet 2 TA147585 6-134