TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 205 of 772

TM 9-2350-260-20-1-2 ENGINE OIL COOLER REPLACEMENT (2D ENGINE) (Sheet 1 of 6) PROCEDURE INDEX PROCEDURE PAGE Removal 6-128 Installation 6-131 TOOLS: 1/2 in. socket with 1/2 in. drive Ratchet with 1/2 in. drive 5 in. extension with 1/2 in. drive 1/2 in. combination box and open end wrench 3/4 in. combination box and open end wrench 1-1/2 in. open end wrench SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section I) SUPPLIES: Washer (MS9320-12) Drip pan Masking tape (Item 57, Appendix D) Plastic barrier material (Item 41, Appendix D) Lockwasher (MS35335-34) (4 required) REFERENCES: TM 9-2350-260-10 LO 9-2350-260-12 PRELIMINARY PROCEDURES: Remove powerplant (page 5-27) Remove engine shroud (page 9-2) REMOVAL: 1. Using 1/2 inch socket, remove screw (A) and washer. Throw washer away. 2. Using 3/4 inch wrench, loosen valve (B) six complete turns. Go on to Sheet 2 TA147579 6-128