TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 121 of 772

TM 9-2350-260-20-1-2 OIL FILLER TUBE (UPPER) REPLACEMENT (Sheet 4 of 4) 8. Place clamp (J) on hose (K) with nut facing you. 9. Position tube assembly (F) with its assembled parts on powerplant. 10. Push tube assembly (F) into hose (K). 11. Position clamp (J) over end of hose (K). 12. Place two new lockwashers (L) on two screws (M). 13. Start two screws (M) through clamps of tube assembly (F). 14. Using 1/2 inch socket, tighten two screws (M). 15. With clamp (J) positioned over end of hose, use 5/16 inch socket and tighten nut of clamp (J). 16. Position bracket (N), clamp (P), and screw (Q). 17. Start new locknuts (R) on screw (Q). 18. Using 1/2 inch socket and wrench, tighten nuts (R). 19. Install 2A powerplant (page 5-14) or 2D powerplant (page 5-40). End of Task TA147498 6-44