TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download
Page 12 of 772
TM 9-2350-260-20-1-2 POWERPLANT REPLACEMENT (2A ENGINE) (Sheet 1 of 24) PROCEDURE INDEX PROCEDURE PAGE Removal 5-3 Installation 5-14 TOOLS: 5 ton hoist or comparable lifting device capable of lifting powerplant 12 ft. high Ratchet with 1/2 in. drive 9/16 in. socket with 1/2 in. drive 7/16 in. socket with 1/2 in. drive 3/4 in. socket with 1/2 in. drive Ratchet with 3/4 in. drive 1-1/2 in. socket with 3/4 in. drive Torque wrench with 3/4 in. drive (0-600 lb-ft)(0-813 N•m) 7/16 in. combination box and open end wrench Adjustable wrench (10 inch) Spanner wrench Flat-tip screwdriver Putty knife Pliers Flashlight (if required) Pinch bar (commander's station right side wall) Hammer Cutting pliers SPECIAL TOOLS: Powerplant lifting sling (Item 31, Chapter 3, Section I) FABRICATED TOOLS: Final drive guide shield (Fig. 1, Appendix F) (2 required) SUPPLIES: Adhesive(Item 2, Appendix D) Covers for fire extinguisher tubing fittings Covers for fuel return line fittings and press Covers for primary fuel line fittings Covers for air cleaner outlet hose connect points Grease (Item 36, Appendix D) Heavy masking tape (Item 57, Appendix D) Rags (Item 65, Appendix D) Dry cleaning solvent (Item 54, Appendix D) Rubber gloves Wooden block, 12 x 12 x 12 in. (3 required) Lockwire (Item 60, Appendix D) Lockwasher (MS35338-44) (4 required) Lockwasher (MS35338-53) (2 required) Lockwasher (MS35338-65) (12 required) PERSONNEL: Three REFERENCE: TM 9-2350-260-10 Go on to Sheet 2 TA147903 5-2