TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 118 of 772

TM 9-2350-260-20-1-2 OIL FILLER TUBE (UPPER) REPLACEMENT (Sheet 1 of 4) PROCEDURE INDEX PROCEDURE PAGE Removal 6-41 Installation 6-43 TOOLS: 5/16 in. socket with 1/2 in. drive 5 in. extension with 1/2 in. drive Ratchet with 1/2 in. drive 1/2 in. socket with 1/2 in. drive 1/2 in. combination box and open end wrench Putty knife Flat-tip screwdriver Vise Hammer SUPPLIES: Packing (8717158) Locknuts (MS21044N5) (2 required) Lockwashers (7410218) (2 required) PRELIMINARY PROCEDURE: Remove powerplant (page 5-1) REMOVAL: 1. Using wrench and 1/2 inch socket, remove two screws (A), locknuts (B), and connecting bracket (C). Throw locknuts away. 2. Remove bracket (C). Go on to Sheet 2 TA147495 6-41