TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 115 of 772

TM 9-2350-260-20-1-2 ENGINE OIL LEVEL GAGE CAP REPLACEMENT (2D ENGINE) (Sheet 1 of 3) TOOLS: 1/2 in. socket with 1/2 in. drive Ratchet with 1/2 in. drive SUPPLIES: Gasket (10935621) Lockwasher (7410218) (2 required) PRELIMINARY PROCEDURES: Remove powerplant (page 5-27) Remove engine shroud (page 9-2) REMOVAL: 1. Using socket, remove four screws and washers (A) securing plate with electrical connectors (B). 2. Position plate with electrical connectors (B) aside. Go on to Sheet 2 TA147492 6-38