TM-9-2350-260-20-1-2 M60 Hull Organizational Maintenance Volume 2 Download

Page 111 of 772

TM 9-2350-260-20-1-2 ENGINE OIL LEVEL GAGE CAP REPLACEMENT (2A ENGINE) (Sheet 1 of 4) PROCEDURE INDEX PROCEDURE PAGE Removal 6-34 Installation 6-36 TOOLS: 3/8 in. combination box and open end wrench 1/2 in. socket with 1/2 in. drive 5 in. extension with 1/2 in. drive Ratchet with 1/2 in. drive SUPPLIES: Gasket (10935621) Preformed pacing (MS28775-327) (2 required) Lockwasher (MS90726-31) (2 required) PRELIMINARY PROCEDURE: Remove powerplant (page 5-2) REMOVAL: 1. Open cap assembly (A) and remove oil level gage. 2. Using 3/8 inch wrench, disconnect fuel drain tubes (B) from valves (C). 3. Open straps (D) and remove fuel drain hoses (E). 4. Using 1/2 inch socket, remove two screws (F) securing valves (C) and bracket (G). 5. Remove bracket (G), valves (C), and hoses (E) as a unit from engine. Go on to Sheet 2 TA147488 6-34