TB-9-2300-378-14 Technical Bulletin for Air Induction System M48 M60 Download

Page 76 of 296

TB 9-2300-378-14 (h) After each hole is drilled, install bolt, washer and nut to insure air cleaner dues not shift during subsequent drilling operation (view B). (i) After drilling all four 5/8 inch holes, loosen all mounting bolts and check for gap between air cleaner base plate and outriggers. If a gap exists, use washers (maximum of three per bolt) to shim gap lighten 5/8 inch mounting. (j) Apply primer, NSN 8030-00-900-2373 and locking 148-9833, to bolt threads and nuts. (k) Tighten 5/8 inch bolts to 85-95 1b-ft (115-129) and ft (30-41 N·m). (l) Tighten fender extension mounting bolts. (m) Connect battery ground cables (TM-20). 4-6. V-Band Clamps (Fig. 4-11) compound. NSN 3/8 inch bolts to 8030-00- 22-30 lb- Figure 4-11. V-band clamps. 4-16