MWO-9-2300-378-34-2 Maintenance Work Order for M60 Smoke Generation Download

Page 40 of 92

MWO 9-2300-378-34-2 Section III. Hull Wiring Instructions for M60A3 and M60A1 (RSE) Vehicles NOTE Figures 33, 34, 35, 36 and 37 shown for reference and clarity. (1) Inside driver’s compartment, remove and discard four screws MS90726-6 and lockwashers MS35338-44 securing gage indicator panel to its mounting bracket (figure 27). (2) Route switch plug connector end of harries assembly 12270526 along existing harness behind gage indicator panel and secure with existing clamps MS90350-23, as shown in figure 28, view A. (3) Connect receptacle connector mounting bracket with For and harness 12270526 plug connector to smoke generator switch assembly and attach switch bracket along with gage indicator panel-to-panel four screws MS90726-9 and lockwashers MS35333-40 (figure 29). NOTE vehicles without M-9 bulldozer, perform steps 1, 2, 3, then steps 14 thru 25. For vehicles with M-9 bulldozer, perform steps 4 thru 25. Figure 27. Removing Gage Indicator Panel 38