MWO-9-2300-378-34-2 Maintenance Work Order for M60 Smoke Generation Download

Page 21 of 92

MWO 9-2300-378-34-2 c. Installation of Right and Left Bank Tube Assemblies. (1) Obtain tee 11669685 and 45° elbow MS51817-25 from kit. Secure tee in vise, apply teflon tape on 45 elbow and install elbow in tee (figure 8). (2) Connect tube assembly 12275782 to solenoid outlet elbow and 45° elbow MS 51817-25 (figure 8). Do not tighten tube nuts at this time. Figure 8. Installation of Solenoid Valve Outlet Tube 19