
TM-9-2815-210-34-2-2 LDS-465-1/LDS-465-2 Multifuel Engine Maintenance Manual Part 2
Page 558 of 968
TM 9-2815-210-34-2-2 FRAME 2 1. 2. 3. 4. NOTE This is an alternate procedure given for reference pur- poses only. Standard procedure is to test flame heater nozzle during dynamometer test and adjustment. Hook up hose (1) from supply tank (2) of diesel fuel to pump inlet (3). Hook up hose (4) from pump outlet (5) to pressure gage (6). Hook up adjustable valve (7) from pressure gage (6). Hook UP hose (8) from adjustable valve (7) to nozzle and check valve assembly (9) and inlet opening (10). GO TO FRAME 3 4-539