
TM-9-2815-210-34-2-2 LDS-465-1/LDS-465-2 Multifuel Engine Maintenance Manual Part 2
Page 554 of 968
e. Flow Test. TM 9-2815-210-34-2-2 WARNING Smoking, sparks or open flames are not allowed within 50 feet of work area during this task. Fire or explosion could occur, causing injury to personnel and damage to equipment. NOTE This is an alternate procedure included for ref- erence purposes only. Standard procedure is to test fuel pump during dynamometer test and adjustment. FRAME 1 1. Set rheostat (1) until voltmeter (2) reads 10 volts. 2. Set adjustable valve (3) until pressure gage (4) 3. Pump (5) should flow a minimum of one pint in 2 4. Turn off rheostat (1) and open adjustable valve 5. Take out pump (5) from test setup. 6. Take apart test setup. END OF TASK read 60 psi. minutes and 45 seconds. (3) to bleed off pressure. 4-535