TM-9-2320-386-24-1-2 Page 287

TM-9-2320-386-24-1-2 Unit Maintenance Manual Part 2 for M44A3 Series Trucks

Page 287 of 636

28. Route STE/ICE-R wiring harness (14) and battery positive cable (17) through frame rail (9) and grommet (10). 29. Install slave receptacle cable (1), STE/ICE-R terminal with leads 770-E and 770-V (20), and positive battery cable (17) on positive battery post clamp (19) with screw (21) and nut (18). 30. Install STE/ICE-R terminal lead 770-X (8) on frame rail cable positive (+) side of shunt (24) with washer (2), new lockwasher (5), and screw (7). 31. Install two STE/ICE-R terminal leads with wires 770-Y (3) and 770-W and 770-F (4) on battery cable negative (-) side of shunt (24) with washer (2), new lockwasher (5), and screw (6). 32. Install two clamps (16) on STE/ICE-R wiring harness (14) and rear of battery box (23) with two screws (15) and new locknuts (22). 33. Install clamp (12) on STE/ICE-R wiring harness (14), slave receptacle cable (1), and frame rail (9) with screw (13) and new locknut (11). 34. Connect battery ground cable (WP 0121 00). ~ 1 14 24 2 3 4 5 6 7 5 8 2 9 10 11 12 13 1 14 15 16 16 17 18 19 20 21 22 ~ 23 TM 9-2320-386-24-1-2 0331 00 STE/ICE-R WIRING HARNESS REPLACEMENT (Contd) 0331 00-14 END OF WORK PACKAGE