TM-9-2320-386-24-1-2 Page 262

TM-9-2320-386-24-1-2 Unit Maintenance Manual Part 2 for M44A3 Series Trucks

Page 262 of 636

19. Position clamp (16) on wiring harness (19) and install clamp (16) on under side of frame rail (14) with screw (18) and new locknut (17). 20. Install two ground (GND) leads (13) on frame rail (14) with two new lockwashers (12), screw (11), and nut (15). NOTE Vehicles may come equipped with a Leece-Neville or Prestolite alternator. The wiring harness leads are connected to negative and positive posts on either alternator. 21. Install positive lead 2 and STE/ICE-R harness lead 770-N (4) on alternator terminal post (9) with new lockwasher (8) and nut (7). Tighten nut (7) 45-55 lb-in. (5.1-6.2 Nm). NOTE Sealing compound is used to prevent corrosion on terminal posts. Ensure wires and terminals are clean before connections are made. 22. Apply sealing compound to leads (4) and terminal post (9) on alternator (10). NOTE Perform step 23 for Prestolite alternator only. 23. Install plate (1) on alternator (10) with two lockwashers (2) and screws (3). Tighten screws (3) 30-35 lb-in. (3.4-3.9 Nm). 24. Pack cover plate (5) with sealing compound. LEECE-NEVILLE 23 25 26 24 TM 9-2320-386-24-1-2 0330 00 FRONT WIRING HARNESS REPLACEMENT (Contd) 0330 00-22 1 2 3 5 6 4 7 8 9 10 ~ 14 12 15 17 16 18 19 20 21 ~ 11 12 13 PRESTOLITE 7 8 4 6 22 5 9 10 20 21 ~