CLEANING AND INSPECTION WARNING Skysol-100 mixture is combustible. Use mechanical ventilation whenever product is used in a confined space, is heated above ambient temperatures, or is agitated. DO NOT use or store near heat, sparks, flame, or other ignition sources. Keep container sealed when not in use. Contact with Skysol-100 may cause skin irritation. Use chemical resistant gloves. In case of skin contact, remove any contaminated clothing and wash skin thoroughly with soap and water. Wash contaminated clothing before reuse. Eye contact may cause irritation, tearing, or blurring of vision. Use face shield or goggles when eye contact may occur. In case of eye contact, flush eyes with large amounts of water for at least fifteen (15) minutes or until irritation subsides. Inhalation may cause irritation to upper respiratory passages. DO NOT have food or drink in the vicinity. 1. Clean fuel injection control linkage (2) with Skysol-100 and dry with lint-free cloth. 2. Inspect fuel injection control linkage (2) for bends, breaks, cracks, binding, and wear. Replace fuel injector control linkage (2) if damaged. INSTALLATION CAUTION Fuel injector springs must be compressed to allow free movement of the injector rack. Failure to do so may result in damage to fuel injectors. 1. Position fuel injection control linkage (2) on cylinder head (3). 2. Slide link (4) on fuel injection control linkage (2) through sleeve (5). 3. Engage six fuel injector control arms (6) with fuel injector control racks (7). CAUTION Fuel injector control arms on the fuel injection control linkage must be aligned with each fuel injector control rack before tightening screws. Failure to comply may result in damage to equipment. NOTE Ensure small dowel in each mounting bracket is properly aligned before tightening screws. 4. Install fuel injection control linkage (2) on cylinder head (3) with four screws (1). 5. Install new O-ring (11) on sleeve (5). 6. Install clevis (8) on link (4) with pin (12) and new retaining ring (9). 7. Using soft-jawed pliers, slide sleeve (5) from cylinder head (3) into governor (13). 8. Install clip (10) on sleeve (5). 9. Install rocker arm assemblies and pushrods (WP 0309 00). 10. Perform fuel injector syncronization (WP 0321 00). TM 9-2320-386-24-1-2 0320 00 FUEL INJECTION CONTROL LINKAGE MAINTENANCE (Contd) 0320 00-4
