TM-9-2320-361-34 Page 643

TM-9-2320-361-34 Direct Maintenance Manual for M44A2 Series Trucks

Page 643 of 764

TM 9-2320-361-34 16-22. TRANSMISSION POWER TAKEOFF (PTO) COVER AND GASKET REPLACEMENT THIS TASK COVERS: a. Removal c. Installation b. Cleaning INITIAL SETUP APPLICABLE MODELS All vehicles except M342A2 TOOLS General mechanic’s tool kit (Appendix B, Item 1) MATERIALS/PARTS Six lockwashers (Appendix F, Item 146) Gasket (Appendix F, Item 77) REFERENCES (TM) TM 9-2320-361-10 TM 9-2320-361-34P TM 9-2520-246-34P LO 9-2320-209-12-1 EQUIPMENT CONDITION Parking brake set (TM 2320-361-10). Wheels chocked (TM 9-2320-361-10). Transmission oil drained (LO 9-2320-209-12-1). a. Removal Remove six screws (5), lockwashers (4), cover (3), and gasket (2) from transmission power takeoff (PTO) (1). Discard gasket (2) and lockwashers (4). I b. Cleaning c. Installation Clean mating surface between cover (3) and PTO (1). Install new gasket (2) and cover (3) on PTO (1) with six new lockwashers (4) and screws (5). FOLLOW-ON TASK: Fill transmission to proper fluid level (LO 9-2320-209-12-1). 16-100