TM 9-2320-361-34 I 15-51. PIPELINE CONSTRUCTION BODY MAINTENANCE THIS TASK COVERS: a. Subframe Removal d. Flooring Installation b. Flooring Removal e. Subframe Installation c. Inspection INITIAL SETUP APPLICABLE MODELS EQUIPMENT CONDITION M756A2 TOOLS General mechanic’s tool kit (Appendix B, Item 1) Torque wrench, 1/2-in. dr. (Appendix B, Item 7) 1-1/8-in. socket, 1/2-in. dr. (Appendix B, Item 10) 1-1/16-in. socket, 1/2-in. dr. (Appendix B, Item 11) MATERIALS/PARTS Fifty-six locknuts (Appendix F, Item 110) Six locknuts (Appendix F, Item 89) Eight locknuts (Appendix F, Item 104) Six locknuts (Appendix F, Item 103) PERSONNEL REQUIRED Two REFERENCES (TM) TB 43-0209 ● ● ● ● ● ● Bows and tarp removed (TM 9-2320-361-10). Side panels removed (TM 9-2320-361-20). Tailgate removed (TM 9-2320-361-20). Stiff leg jack removed (TM 9-2320-361-20). Gin pole removed (TM 9-2320-361-20). Front and rear splash guards removed (TM 9-2320-361-20). Step plate removed (TM 9-2320-361-20). Tailboard roller removed (para. 15-53). GENERAL SAFETY INSTRUCTIONS ● All personnel must stand clear during lifting operations. ● Toolbox is heavy. Ensure toolbox is empty and supported before removal and installation. . Toolbox and subframe are heavy. Ensure lifting capacity is greater than weight of the toolbox and subframe. TM 9-2320-361-10 TM 9-2320-361-20 TM 9-2320-361-34P 15-217
