TM-9-2320-361-34 Page 377

TM-9-2320-361-34 Direct Maintenance Manual for M44A2 Series Trucks

Page 377 of 764

TM 9-2320-361-34 15-16. VAN BODY CEILING PANEL REPLACEMENT THIS TASK COVERS: a. Removal b. Installation INITIAL SETUP APPLICABLE MODELS M185A3 and M109A3 TOOLS General mechanic’s tool kit (Appendix B, Item 1) PERSONNEL REQUIRED Two REFERENCES (TM) TM 9-2320-361-20 TM 9-2320-361-34P EQUIPMENT CONDITION (Contd) . Dome lights removed (TM 9-2320-361-20). . Front and side window sashes removed (paras. 15-29 and 15-30). Exhaust blower motor and bracket removed (TM 9-2320-361-20). Multibreaker and safety switch boxes removed (paras. 15-26 and 15-27). .115-volt receptacle strip removed (para. 15-21). Primary or secondary van body heaters removed (if installed) (TM 9-2320-361-20). GENERAL SAFETY INSTRUCTIONS EQUIPMENT CONDITION Gloves, eyeshields, and dust mask must be worn during panel removal and installation. Parking brake set (TM 9-2320-361-10). WARNING Gloves, eyeshields, and dust mask must be worn during panel removal and installation. Failure to do so may result in injury to personnel. NOTE Ceiling panels on both sides of van ceiling are removed and installed basically the same. This procedure covers one side. a. Removal 1. Remove twenty screws (5) and center ceiling panel (6) from two ceiling panels (1), ceiling panel (8), and frame (2). 2. Remove thirty-two screws (7), two ceiling panels (1), and ceiling panel (8) from frame (2). b. Installation 1. Position two ceiling panels (1) and ceiling panel (8) on frame (2) and aline panel (1) screw holes (4) with screw holes (3) in frame (2). 2. Install two ceiling panels (1) and ceiling panel (8) with thirty-two screws (7). 3. Install center ceiling panel (6) on frame (2), two ceiling panels (1), and ceiling panel (8) with twenty screws (5). 15-66