TM 9-2320-361-34 I 3-18. ENGINE REPLACEMENT (Contd) 50. Remove screw-assembled lockwasher (8) and lockwasher (6) from transmission (5) and install lockwasher (6) and ground strap (7) on transmission (5) with screw-assembled lockwasher (8). Tighten screw-assembled lockwasher (8) 23-26 lb-ft (31-35 N.m). 51. Remove screw (4) from engine (1) and install washer (2) and ground strap (3) on engine (1) with screw (4). FOLLOW-ON TASKS: ● Install air cleaner assembly (TM 9-2320-361-20). ● Install transmission gearshift lever (TM 9-2320-361-20). ● Install radiator and brackets (TM 9-2320-361-20). ● Install cab tunnel panel (TM 9-2320-361-20). ● Install front winch propeller shah, if equipped (TM 9-2320-361-20). ● Install propeller shaft (TM 9-2320-361-20). ● Fill engine crankcase to proper oil level (LO 9-2320-209-12-1). ● Adjust hand throttle control cable (TM 9-2320-361-20). ● Adjust engine stop control cable (TM 9-2320-361-20). ● Adjust accelerator linkage (TM 9-2320-361-20), ● Adjust clutch control linkage (TM 9-2320-361-20). ● Connect battery ground cable (TM 9-2320-361-20). 3-76
