
TM-9-2320-361-24-2 Field Maintenance Manual Volume 2 for M44A2 Series Trucks
Page 883 of 1144
TM 9-2320-361-24-2 0432 00 0432 00-3/4 blank PERSONNEL HEATER BURNER MAINTENANCE (Contd) END OF WORK PACKAGE INSTALLATION 1. Position new preformed packing (12), new O-ring (11), and burner (8) on heat exchanger (10) and install with four clamp and hook bolts (1). Tighten nut-assembled lockwasher (2). 2. Install new lockwasher (6) and ground strap (5) on heater housing (9) and hook bolt (1) with screw (7), new nut-assembled lockwasher (3) and nut-assembled lockwasher (4). 3. Install personnel heater fuel line and blower housing (WP 0430 00). 4. Connect battery ground cable (WP 0126 00). 5. Release parking brake and remove wheel chocks (TM 9-2320-361-10). 23 22 21 20 19 18 17 16 13 12 15 14 8 11 9 9 8 7 6 5 3 4 2 1 ~ 10