
TM-9-2320-361-24-2 Field Maintenance Manual Volume 2 for M44A2 Series Trucks
Page 518 of 1144
TM 9-2320-361-24-2 0334 00 0334 00-2 POWER SWITCH MAINTENANCE (Contd) NOTE Prior to removal, tag all lead wires and terminals for installation. REMOVAL 1. Remove four screws (1) and power switch cover (3) from van body (2). 2. Remove two screws (9), lockwashers (8), and wires (4) and (10) from switch (11). Discard lockwashers (8). 3. Remove two screws (7), lockwashers (6), and wires (4), (5), (12) and (13) from switch (14). Discard lockwashers (6). DISASSEMBLY 1. Remove two nuts (18), lockwashers (17), and power switch cover (3) from switches (11) and (14). Discard lockwashers (17). 2. Remove two lockwashers (15) and nuts (16) from switches (11) and (14). Discard lockwashers (15). ASSEMBLY 1. Install two nuts (16) and new lockwashers (15) on switches (14) and (11). 2. Install switches (14) and (11) on power switch cover (3) with two new lockwashers (17) and nuts (18). INSTALLATION 1. Install wires (4), (5), (12), and (13) on switch (14) with two new lockwashers (6) and screws (7). 2. Install wires (4) and (10) on switch (11) with two new lockwashers (8) and screws (9). 3. Install power switch cover (3) on van body (2) with four screws (1). 4. Connect battery ground cable (WP 0126 00). 5. Release parking brake and remove wheel chocks (TM 9-2320-361-10).