TM-9-2320-361-24-2 Page 493

TM-9-2320-361-24-2 Field Maintenance Manual Volume 2 for M44A2 Series Trucks

Page 493 of 1144

TM 9-2320-361-24-2 0324 00 0324 00-1/2 blank FIELD MAINTENANCE INSTRUCTIONS 2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL) 24-VOLT CIRCUIT BREAKER REPLACEMENT REMOVAL AND INSTALLATION INITIAL SETUP: Applicable Models M185A3, M109A3 Materials/Parts Two lockwashers (item 245, WP 0470 00) Equipment Condition Parking brake set and wheels chocked (TM 9-2320-361-10). Battery ground cable disconnected (WP 0126 00). REMOVAL 1. Disconnect two wires (4) from circuit breaker (3). 2. Remove two nuts (1), lockwashers (2), screws (5), and circuit breaker (3) from van body (6). Discard lockwashers (2). INSTALLATION 1. Install circuit breaker (3) on van body (6) with two screws (5), new lockwashers (2), and nuts (1). 2. Connect two wires (4) to circuit breaker (3). 3. Connect battery ground cable (WP 0126 00). 4. Release parking brake and remove wheel chocks (TM 9-2320-361-10). END OF WORK PACKAGE 1 2 3 4 5 6 ~