
TM-9-2320-361-24-2 Field Maintenance Manual Volume 2 for M44A2 Series Trucks
Page 1072 of 1144
TM 9-2320-361-24-2 0467 00 0467 00-24 MAINTENANCE ALLOCATION CHART (MAC) (Contd) TM 9-2320-361-24-2 0467 00 0467 00-24 Table 3. Remarks. REFERENCE CODE REMARKS A B C D E F G H I J K L M N O P Q R S T U Perform PMCS as shown in TM 9-2320-361-10. Engine overhaul will be in accordance with DMWR 9-2815-210. Welding will be in accordance with TC 9-237. Repair of lines and fittings will be in accordance with TM 9-243. Test and repair of radiator will be in accordance with TM 750-254. Repair of alternator will be in accordance with TM 9-2920-225-34. Repair of starter will be in accordance with TM 9-2920-243-34. Repair of batteries will be in accordance with TM 9-6140-200-14. Transmission repair and overhaul will be in accordance with TM 9-2520-246-34. Transfer case overhaul will be in accordance with TM 9-2520-246-34-1. Overhaul of front and rear axle will be in accordance with NMWR 9-2520-587. Repair, inspection, and storage of tires/tubes will be in accordance with TM 9-2610-200-14. Repair of frames will be in accordance with TB 9-2300-247-40. Metal body repair will be in accordance with TC 9-510. Overhaul of front winches will be in accordance with NMWR 9-3830-501. Refer to kit installation instructions for kit installation. Inspection of brake lines will be in accordance with TB 9-2300-405-14. Service/inspection of winch/hoist wire rope/cables will be in accordance with TB 43-0142. Repair of canvas will be in accordance with FM 10-16. Inspection and repair will be in accordance with TM 9-2815-210-34-1. Inspection and repair of brake drums will be in accordance with TM 9-4910-482-10. END OF WORK PACKAGE