TM 9-2320-361-20 13-23. POWER DIVIDER CONTROL LEVER AND LINKAGE REPLACEMENT (M764) This task covers: a. Removal c. Adjustment b. Installation INITIAL SETUP: APPLICABLE MODELS M764 MATERIALS/PARTS Two cotter pins Locknut REFERENCES (TM) TM 9-2320-361-10 TM 9-2320-361-20P EQUIPMENT CONDITION Parking brake set (TM 9-2320-361-10). 1. Remove cotter pin (3), clevis pin (1), and control rod (5) from power divider shaft (2). Discard cotter pin (3). 2. Remove cotter pin (14), clevis pin (11), and control rod (5) from control lever (12). Discard cotter pin (14). 3. Remove locknut (10), screw (7), washer (13), spacer (8), and control lever (12) from bracket (9). Discard locknut (10). Install control lever (12) to bracket (9) with spacer (8), washer (13), screw (7), and new locknut (10). 1. Adjust control rod (5) to 42.5 in. (108 cm) from center of both clevis holes (6) and (4). 2. Install control lever (5) to power divider shaft (2) with clevis pin (1) and new cotter pin (3). 3. Connect control rod (5) to control lever (12) with clevis pin (11) and new cotter pin (14). 13-40
