TM-9-2320-209-34-2-3 Page 89

TM-9-2320-209-34-2-3 Maintenance Part 3 for M44A1 and M44A2 Series Trucks

Page 89 of 592

TM 9-2320-209-34-2-3 FRAME 6 1. With hoist still joined to upper and lower carriage tie rods (1), take off nut (2) and washer (3). 2. Take out two capscrews (4) and washers (5) holding support (6). 3. Lift off carriage and tie rod assembly and place on work bench. 4. Take out nut, washer, and capscrew (7) from support assembly (8). 5. Take off nuts (9) and capscrews (10), holding tie rods (1) to support assembly (8). 6. Slide support assembly (8) off tie rods (1). GO TO FRAME 7 18-78