TM-9-2320-209-34-2-3 Page 284

TM-9-2320-209-34-2-3 Maintenance Part 3 for M44A1 and M44A2 Series Trucks

Page 284 of 592

TM 9-2320-209-34-2-3 FRAME 5 1. Working at front of right air reservoir (1), put on retaining strap (2). 2. Put in two capscrews (3) and locknuts (4). CAUTION Do not tighten coupling nut (5) too much. coupling nut onto fitting, then tighten nut 3. Put on coupling nut (5). Follow-on 1. Do air system NOTE Maintenance Action Finger tighten 1/8 turn. Required: leak test. Refer to TM 9-2320-209-20. 2. Replace power divider propeller shaft. Refer to TM 9-2320-209-20. 3. Replace transfer-to-forward-rear axle propeller shaft. Refer to Propeller Shaft and Universal Joint Removal and Replacement, TM 9-2320-209-20. 4. Replace earth boring machine propeller shaft. Refer to TM 9-2320-209-20. END OF TASK 18-273