TM 9-2320-209-34-2-3 b. Replacement. FRAME 1 Soldier A 1. Using hoist, raise power divider (1) into position with sprocket (2) facing toward front of truck. NOTE If chain (3) has been taken off, put on chain and master link after step 3. Soldier B 2. Working from above power divider (1), lower chain (3) toward power divider (1) and hold it. Soldier A 3. Put chain (3) on sprocket (2). Align mounting holes on power divider (1) with mounting holes on 4. Put in four capscrews and washers 105 to 115 pound-feet. GO TO FRAME 2 mounting b-rackets (4 and 5). (6). Tighten cap screws to 18-269
