TM 9-2320-209-34-2-3 FRAME 2 1. Put hoist control valve lever (1) on control box (2) and trunnion (3). 2. Put in screw (4) and screw on and tighten locknut (5). NOTE Follow-on Maintenance Action Required: 1. Replace hydraulic pump adapter and spacer. Refer to para 18-9. 2. Replace power takeoff propeller shaft. Refer to Propeller Shaft and Universal Joint Removal and Replacement, TM 9-2320-209-20. 3. Fill hydraulic system. Refer to LO 9-2320-209-12/1. 4. Raise dump body and drop braces. Lower dump END OF TASK body . Refer to TM 9-2320-209-10. 18-217
