TM 9-2320-209-34-2-3 FRAME 3 1. 2. 3. 4. 5. 6. GO Put valve lever shaft (1) into housing (2) on top of power takeoff lever cam (3). Hub of valve lever cam (4) must be against housing. Move valve lever cam (4) all the way up and all the way down. must move same distance above and below horizontal centerline Keyway (5) scribed on housing (2). Fill housing (2) with grease. Put gasket (6) on housing (2). Put on cover (7) and put in four Put in lubrication fitting (10). TO FRAME 4 lockwashers (8) and screws (9). 18-182
