TM-9-2320-209-34-2-3 Page 178

TM-9-2320-209-34-2-3 Maintenance Part 3 for M44A1 and M44A2 Series Trucks

Page 178 of 592

TM 9-2320-209-34-2-3 FRAME 7 Soldiers 1. Align screw holes in earth boring machine propeller shaft (1) with A and B screw holes in power divider companion flange (2). Soldier A 2. Put in two screws (3). 3. Put on two nuts (4). Soldiers 4. Align screw holes in earth boring machine propeller shaft (1) with A and B screw holes in main drive idler gear companion flange (5). Soldier B 5. Put in four screws (6). 6. Put on four nuts (7). END OF TASK 18-167