TM 9-2320-209-34-2-3 FRAME 7 1. 2. 3. 4. 5. 6. 7. 8. 9. Put the original shim set (1) on wormshaft (2). Put key (3) on wormshaft (2) and slide sleeve (4) over key. Put on capscrew and washer (5). Turn wormshaft (2) to be sure inner bearing cone is properly seated against shoulder of wormshaft. Slide sprocket (6) over sleeve (4). Aline hole in sprocket with hole in sleeve. Put pin (7) through sprocket Put on two cotter pins (8). Put lubricating fitting (9) on (6) and sleeve sprocket (6). Put retaining ring (10) on sleeve (4). (4). GO TO FRAME 8 18-119
