TM 9-2320-209-34-2-3 FRAME 6 1. 2. 3. 4. 5. GO Put new gasket (1) and bearing retainer (2) on bearing housing (3). Put two capscrews (4) on the lower part of bearing housing (3) and bearing retainer (2). NOTE The upper capscrews are put in during installation of cable level winder assembly. Tie capscrews (4) together with safety wire (5). Put spacer (6) on wormshaft (7) up against outer bearing assembly (8). Be sure that oil seal (9) is properly seated around spacer (6). TO FRAME 7 18-118
