TM-9-2320-209-34-2-2 Page 848

TM-9-2320-209-34-2-2 Maintenance Part 2 for M44A1 and M44A2 Series Trucks

Page 848 of 899

TM 9-2320-209-34-2-2 FRAME 3 1. 2. 3. 4. 5. 6. Join chain slings to dump body (1) as shown. Join chain slings to hoist. Raise dump body and position safety braces. Refer to TM 9-2320-209-20. Aline holes in crosshead roller arms (2) with holes for lift pins (3) under dump body (1). Drive in two lift pins (3). Put in two lubrication fittings (4). Put in two screws (5) and nuts (6). Raise dump body (1) to take weight off safety braces (7). Lower safety Using hoist, lower dump body (1). Take away hoist and chain slings. NOTE Follow-on Maintenance Action Required: 1. Replace taillights and stoplights. Refer to TM 9-2320-209-20. 2. Replace tailgate. Refer to para 17-66. 3. Adjust tailgate linkage. Refer to para 17-68h. END OF TASK braces. 17-830